Sectors
One methodology, every sector — risk framing built to the project type.
Land assembly and landholder engagement, sized to the project — not rule of thumb. Each sector has a dedicated team, sector‑specific risk framing and an approach built from project counts in the hundreds, not the handful. The gated methodology is the same across all sectors we work in; the screening logic, engagement narrative and negotiation strategy are tailored to the sector.
Wind
Wind — AA's highest‑volume sector.
More than 800 landholders engaged across wind projects in NSW and Victoria. Wind carries the highest engagement burden of any technology type; we plan from landholder counts, not estimates.
Regional cover: NSW · VIC — 800+ landholders engaged
Transmission
Transmission corridors and substation co‑location.
Corridor‑scale landholder programmes for network operators and government‑backed schemes. Multi-decade easements; multi-landholder coordination.
Regional cover: NSW, SA , VIC, QLD
Data Centres
Site assembly for data centre developers.
Active prospecting in Sydney, Melbourne and Newcastle for data centre developer real‑estate teams. Confidentiality envelope respected from desktop through option.
Regional cover: NSW · VIC · QLD
BESS & Solar
Standalone and hybrid storage.
Site control for standalone BESS and Solar+BESS hybrids — grid‑proximate, fewer landholders, faster gates. Back-to-substation easements treated as a second landholder programme, not a footnote.
Regional cover: All states (NSW, VIC, QLD, SA, WA) · NEM-wide
Water Infrastructure
Water network easements and pipeline land access.
Pipeline easements, treatment facility access and water network projects across regional Australia. 50+ year agreements, succession-aware drafting.
Regional cover: NSW · VIC — long-asset-life work
Environmental Restoration
Floodplain and streambank restoration.
Land access for floodplain restoration, streambank stabilisation and riparian works. Short-form access agreements, not easements; bypass not compulsion.
Regional cover: VIC · QLD · NSW — water authorities and catchment programmes
Engage AA
One methodology, every sector — risk framing built to the project type.
Most engagements start with a 30‑minute call to confirm sector fit and scope a Stage 1 desktop programme. Replies within two business days.